Midland Heart agrees repairs to damp, a leak and pests in under three months
Written by Steve Roscoe · Housing Litigation Executive
Our client, a Midland Heart tenant in Birmingham, lived with damp and mould, a leak, pests, problems with the flooring and draughts. The living room was the worst affected room.
Our client reported the problems repeatedly by telephone for between one and two years. Midland Heart sent surveyors to inspect, but no repairs were arranged, and appointments were cancelled.
Our client instructed Antony Hodari Solicitors in June 2026 on a no win, no fee basis. An independent surveyor instructed by Antony Hodari Solicitors estimated repairs at around £6,000, and the landlord's own surveyor agreed.
The claim settled in September 2026 by Part 36 offer, under three months after instruction and without Court proceedings. Midland Heart agreed to carry out repair works within 120 days and to pay our client damages and their legal costs.
Case at a glance
What problems had our client reported?
Our client reported damp and mould, a leak, pests, problems with the flooring, disrepair in the kitchen or bathroom, and draughts. The living room was the worst affected room.
The problems were reported repeatedly from 2024, by telephone. Living with them caused our client stress and anxiety.
Why did the problem persist?
The problems persisted because inspections did not lead to repairs. Midland Heart sent surveyors to inspect the home, but no repairs were arranged, and appointments were cancelled.
Inspecting a problem does not fix it. Once a landlord has notice of disrepair it is responsible for, it must carry out the repair within a reasonable time.
What did Antony Hodari Solicitors do?
We sent a letter of claim in July 2026 under the Pre-Action Protocol for Housing Conditions Claims, the day after our client instructed us.
We arranged an inspection by an independent surveyor in August 2026. The surveyor's report confirmed the disrepair. It identified a possible defect in the roof as the cause of a leak into the front bedroom, found that the floorboards may have gaps and recommended remedial work.
Midland Heart's own surveyor agreed with the findings. Our surveyor estimated the repairs at around £6,000.
How did the claim settle?
The claim settled in September 2026 by Part 36 offer, under three months after our client instructed us and about five weeks after the surveyor's report. Court proceedings were not needed.
Midland Heart agreed to carry out repair works within 120 days and to pay our client damages and their legal costs. The amount of damages is not published.
Is a housing association responsible for damp and mould?
Under section 11 of the Landlord and Tenant Act 1985, a landlord, including a housing association, must keep the structure and exterior of the home in repair. The same duty covers the installations for water and sanitation. Damp caused by a building defect, such as a roof leak, will usually fall within that duty. Where the condition of the home affects health, section 9A of the same Act, inserted by the Homes (Fitness for Human Habitation) Act 2018, may also apply. Liability depends on the tenancy, the cause of the damp, notice to the landlord and the landlord's response.
In this case, both surveyors confirmed the disrepair, including a possible roof defect behind a leak.
My landlord inspected but did not repair. Can I claim?
Possibly. An inspection is not a repair. Once a landlord has notice of disrepair it is responsible for, it must carry out the repair within a reasonable time; if it does not, a claim may be possible, depending on the tenancy, the defect and the landlord's response.
Here, surveyors were sent, but no repairs were arranged before we became involved.
What is a Part 36 offer?
A Part 36 offer is a formal offer to settle made under Part 36 of the Civil Procedure Rules. If the other party refuses it and does no better at trial, it usually faces costs consequences. A settlement reached this way is not confidential in the way a Tomlin order often is.
This claim settled by Part 36 offer in September 2026.
How long does a housing disrepair claim take?
It depends on the defects, the landlord's response and whether Court proceedings are needed. Many claims settle at the Pre-Action Protocol stage, before proceedings are issued.
This claim settled under three months after instruction, without proceedings.
How much compensation can I get for damp and mould?
Whether compensation is recoverable, and how much, depends on the defects, how long they continued after the landlord had notice and the effect on the tenant. No amount is typical.
Our client's settlement included damages, repair works within 120 days and legal costs; the amount of damages is not published.
Related case studies
Has your landlord inspected the problem but not fixed it?
An inspection that leads nowhere does not fix your home. If you are a social housing tenant in England in that position, Antony Hodari Solicitors can assess whether you may have a claim.
We act on a no win, no fee basis in eligible housing disrepair cases, and you can read more of our case studies to see how similar matters have concluded.
Start your housing disrepair claim assessment Or call 0345 504 0005Free case assessment
No obligation · No win, no fee · 24hr response
By submitting this form you agree to our privacy policy. We will only use your details to respond to your enquiry.
Prefer to speak to someone now?
0345 504 0005 Mon–Fri 9am–5:30pm · No obligation“Every case matters. We never allow ourselves to become immune to the conditions our clients are living in.”
Emma Rees · Director