Antony HodariSolicitors
Case study · Windows & Draughts

Notting Hill Genesis agrees window repairs and over £1,500 damages in under three months

Written by Briony Lockett · Fee Earner

SRA RegulatedNo. 569572
Est. 1984Over 40 years’ experience
4.8 / 5 3,700+ reviews on Reviews.io
96% Would RecommendReviewSolicitors verified
No Win, No FeeHousing disrepair claims

Our client, a Notting Hill Genesis tenant in Fulham, London, lived with window disrepair throughout the home. The windows and frames were badly deteriorating, caused draughts and could not be used.

The problem had been reported to the landlord for between two and five years. Notting Hill Genesis carried out remedial repairs, but they failed, and the problems kept returning.

Our client instructed Antony Hodari Solicitors in June 2026 on a no win, no fee basis. Our independent surveyor confirmed the disrepair, and the landlord's own surveyor agreed.

The claim settled in September 2026 by Part 36 offer, under three months after instruction and without Court proceedings. Notting Hill Genesis agreed to carry out repair works within 120 days and to pay our client over £1,500 in damages and their legal costs.

Case at a glance

Claim type: Housing disrepair claim
Main defect: Badly deteriorating windows and frames causing draughts
Consequential disrepair: Windows unusable; the kitchen, living room, a bedroom and the bathroom affected
Landlord: Notting Hill Genesis
Location: Fulham, London
Problems reported since: Between two and five years before instruction
Date instructed: June 2026
Letter of claim sent: June 2026
Expert evidence: Independent surveyor, August 2026, repairs estimated at around £3,000; the landlord's surveyor agreed
Court proceedings: None; settled at the Pre-Action Protocol stage
Settled: September 2026, by Part 36 offer
Time from instruction to settlement: Under three months
Handled by: Briony Lockett
Outcome: Repair works within 120 days, over £1,500 damages and legal costs

What problems had our client reported?

Our client reported problems with the windows in the kitchen, the living room, a bedroom and the bathroom. The windows and frames were badly deteriorating and caused draughts.

Our client was unable to use the windows. Living with the problem, and with repairs that did not last, caused our client stress and anxiety.

Why did the problem persist?

The problem persisted because the repairs carried out did not resolve it. Notting Hill Genesis carried out remedial repairs, but the problems returned each time.

A landlord's duty is to keep the home in repair, not only to attend when a problem is reported. The more substantial repairs the windows needed had not been carried out.

What did Antony Hodari Solicitors do?

We sent a letter of claim in June 2026 under the Pre-Action Protocol for Housing Conditions Claims, a week after our client instructed us.

We arranged an inspection by an independent surveyor in August 2026. The surveyor's report confirmed the disrepair and estimated the repairs at around £3,000. The landlord's own surveyor agreed.

With both surveyors in agreement, we were able to secure more substantial repairs for our client than the earlier repairs, which had failed each time.

How did the claim settle?

The claim settled in September 2026 by Part 36 offer, under three months after our client instructed us and less than a month after the surveyor's report. Court proceedings were not needed.

Notting Hill Genesis agreed to carry out repair works within 120 days and to pay our client over £1,500 in damages and their legal costs.

Is my landlord responsible for repairing windows?

Under section 11 of the Landlord and Tenant Act 1985, a landlord must keep the structure and exterior of the home in repair. Windows and window frames are generally treated as part of the structure and exterior. Liability depends on the tenancy, the defect, notice to the landlord, a reasonable time to repair and the landlord's response.

In this case, both our surveyor and the landlord's surveyor confirmed the disrepair to the windows.

My landlord keeps repairing the same problem. Can I still make a claim?

Possibly. The duty is to keep the property in repair, and a repair that fails may not meet that duty. Whether a claim can be made depends on what an independent inspection finds and how the landlord has responded.

Here, the landlord's earlier repairs had failed, and the settlement secured more substantial works.

What happens if the landlord's surveyor agrees with mine?

Where both surveyors agree on the disrepair and the works needed, there is usually less to dispute, and a claim can often be resolved sooner. Agreement on the disrepair is not the same as an admission of liability, but it narrows the issues.

In this case, the claim settled less than a month after our surveyor's report.

What is a Part 36 offer?

A Part 36 offer is a formal offer to settle made under Part 36 of the Civil Procedure Rules. If the other party refuses it and does no better at trial, it usually faces costs consequences. A settlement reached this way is not confidential in the way a Tomlin order often is.

This claim settled by Part 36 offer in September 2026.

How long does a housing disrepair claim take?

It depends on the defects, the landlord's response and whether Court proceedings are needed. Many claims settle at the Pre-Action Protocol stage, before proceedings are issued.

This claim settled under three months after instruction, without proceedings.

How much compensation can I get for housing disrepair?

Whether compensation is recoverable, and how much, depends on the defects, how long they continued after the landlord had notice and the effect on the tenant. No amount is typical.

Our client's settlement included damages, repair works and legal costs.

Related case studies

Has your landlord failed to fix your windows?

When repairs do not last, the same problem can stay in your home for years. If you are a social housing tenant in England in that position, Antony Hodari Solicitors can assess whether you may have a claim.

We act on a no win, no fee basis in eligible housing disrepair cases, and you can read more of our case studies to see how similar matters have concluded.

Start your housing disrepair claim assessment Or call 0345 504 0005

Free case assessment

No obligation · No win, no fee · 24hr response

By submitting this form you agree to our privacy policy. We will only use your details to respond to your enquiry.

Prefer to speak to someone now?

0345 504 0005 Mon–Fri 9am–5:30pm · No obligation

“Every case matters. We never allow ourselves to become immune to the conditions our clients are living in.”

Emma Rees · Director